Seven Notices, 28 Days: What Actually Happens When SafeWork Walks In

Sep 9
3 min read

Updated: Sep 29

"Hey, just had this happen. This is what I've got." That's how the call started. Seven provisional improvement notices, all from one SafeWork visit. Twenty-eight days to close every one of them out.

"What the hell — I'm still trying to bring in new business, program the guys, make sure they've got the stock."

That's the moment most business owners are in when SafeWork walks out the gate. Panic, then paralysis.

Take a breath. Send them to me.

What a provisional improvement notice actually is

A PIN is one inspector's opinion. It's formed against the codes of practice, and against what's reasonably practicable in your workplace — not some perfect standard nobody meets anywhere.

Getting one isn't rare, and it isn't the end of anything. Somewhere between one and twenty notices in a single visit is normal. Seven, in this case, wasn't a catastrophe. It was a list.

General information only, based on thirty years in workplace safety. This is not legal advice, and every workplace and every notice is different.

The seven

In this case, the notices covered:

  • Traffic management on site

  • A key left in the forklift

  • Racking the inspector didn't believe complied

  • Fire certificates

  • A forklift scheduling and maintenance logbook

  • Two further items from the same visit

How we split it

He organised everything that needed a physical inspection — the forklift service, the racking check, the fire certificates.

I did everything that made those things permanent: a safe operating procedure for the forklift, with the detail nobody writes down — key in a key lock, the lock zip-tied to the machine, never drilled in because that compromises the structure, and a register so only trained operators hold the code. A traffic management plan, with workshop diagrams.

That split matters. You've still got a business to run. My job is the part that doesn't need you standing over it.

The thing nobody asked for

Once the seven were handled, I wrote one more document. A workplace inspection schedule. Nobody asked for it. It wasn't attached to any notice.

But seven notices from one visit means the same things get missed again in six months, if nothing changes how the site checks itself. A patch closes the notice. A system stops it coming back.

"Wow, that's impressive." — the SafeWork inspector, on the completed response

Extensions, and the fine that never happened

One of the seven had a penalty attached — eleven thousand dollars, threatened on the traffic management notice. He panicked about it. I didn't.

If a genuine part of the fix depends on someone else — a contractor, a supplier, a booking you can't bring forward — that's a legitimate reason to ask SafeWork for more time.

Ask early, ask specifically, and keep working the rest of the list while you wait. An extension isn't a way out. It's a way to do it properly instead of rushed.

If this is you, today

  1. Don't argue with the inspector on site, and don't sign anything before you've read it properly. Get the actual notices in hand first.

  2. Check the date on every single notice. Twenty-eight days feels like a long time until a week's gone by and you haven't looked at it.

  3. Get the whole list in front of one person who can turn it into a single action table — issue, action, owner, done — before the panic eats the time you've actually got.

If SafeWork or WorkCover has been on your site and you're holding a stack of notices right now, this is the exact conversation I have every week.

Book a call back.

Servicing Wollondilly, Macarthur, the Southern Highlands, Goulburn and the Illawarra to Nowra.

Comments


GET IN
TOUCH WITH 
ALL ESSENTIALS
SAFETY AND WELLBEING

Wilton (Head Office)
15 Douglas Park Drive
Wilton NSW 2571

​

Oak Flats Office
4 Industrial Lane
Oak Flats NSW 2529

​

PHONE

+61 431 677 669

+61 401 995 935

Preferred time for contact
WHS consultant Sydney

© 2026 by All Essentials Safety and Wellbeing

bottom of page